Interested in installing renewables?

CHELCO's net metering program allows members to connect renewable generation to CHELCO's utility infrastructure. Members who choose to interconnect can sell excess energy to CHELCO at our wholesale power cost.

All interested parties must complete CHELCO’s net metering application and agreement and submit a $25 application fee. A minimum $50 meter reprogramming fee will be added to the member's bill at the time of approval of interconnection. Please note this fee may be higher based on your electric service and meter types. 

These are the different tiers of net metering interconnection, each having specific CHELCO requirements. Please choose the link which best describes the size of the system you are considering installing for a detailed guide and requirements: 

10 kW or less

More than 10 kW but less than 100 kW

More than 100 kW but less than 2 MW

Individuals who are interested in interconnection of renewable generators in excess of 25 kW in capacity must submit the application and meter programming fee and meet the standards set forth in the Consumer Distributed Generation Guide.

For more information on net metering/interconnection, contact CHELCO’s Marketing Department at (850) 892-2111.

 